Get a quote
Granny Flat Cribs

On the tools

No renders, no stock photos. This is the work.

What you're looking at

Real jobs across South East Queensland, shot on the day by the crew. Modular second homes finished in the shed at Laceys Creek and craned onto piers, renovations in Milton and Ashgrove, decks, stairs, bathrooms and floors. Nothing here is a render.

Every one was priced in writing first, built by a QBCC-licensed builder, and left with the yard tidied.

Find your kind of job

A family in front of their new second home
Handover daySecond home, keys handed over
A module arriving on a truck
Delivery dayModule on the tilt tray
A finished second home with a timber deck
Decked and doneSecond home with deck
Builder fixing sheeting
Building it rightLaceys Creek
Kitchen fit-out
Fit-outKitchen in
Builder cutting with a track saw
Cut onceOn the tools
Inside a framed timber extension on an old Queenslander, red LVL wall frames, open roof framing and a new hardwood floor
Milton renovationQueenslander extension, framed and decked
A finished dark-clad 8.4 metre modular home on stands in the factory, ready to be trucked to site
8.4 m second homeFinished in the factory, ready to crane in
A roofer in hi-vis fixing steel roof battens over LVL rafters
Roof onMilton, battens before the iron
A finished bathroom with double rain showers, brass tapware and a timber vanity
Ashgrove renovationNew bathroom, floors and stairs
A carpenter building the timber frame of a large indoor skate ramp in a warehouse
No small jobsAn indoor skate ramp, framed from scratch
A mobile crane lifting a dark-clad modular home into place on a grassy yard
Crane dayModule in the air, Laceys Creek
Drone view at sunrise of three finished modular second homes, two dark and one white, around a fire pit on green grass
Three on the grassFinished homes at Laceys Creek
Black steel module chassis and galvanised wall frames standing under a big open shed
Steel firstChassis and wall frames in the shed
Builders fixing plywood flooring onto a steel floor frame under the shed, one with a nail gun
Floor downPly on the steel floor frame
A builder on a ladder fixing ply sheathing to a module in the shed, insulation bags stacked in front
Wrapped and sheetedPly on, insulation next
A finished dark-clad module on stands in the shed, ready to leave the factory
Clad and readyDark cladding, on stands
Two builders standing in front of a blue steel-framed module under a big open shed, a finished home behind them
Frame upSteel walls standing, Laceys Creek
Looking down a long open shed with modules at different stages, sheet stock racked along one side and a builder at work
The shedThree modules on the go at once
A builder measuring out on a ply floor panel, tool cases and a long level laid out on the bench
Measure twiceSetting out on the floor
A builder in work gear walking into the shed past benches and scaffold, the site dog following
Start of the dayCrew in, dog in
Inside a steel-framed module in the shed, foil-wrapped walls and ceiling, internal wall frames standing on a ply floor
WrappedFoil on before the linings
Two white-clad modules on stands in the shed, a painter in hi-vis on a ladder finishing the cladding
Last coatWhite cladding, painted in the shed
A carpenter in a tool belt opening a stack of tool cases on the workbench
Kit outEvery tool has a box
Get a quote